Unit Operation Process

posted under by Menamas Mitra Energi

Unit Operation process Generating Machine

Unit operation process PLTG'S Machine covers to work it many machine component that consisting of main and Supporting component, one that constitutes one unity / power station machine unit Roll Royce's brand England brand.

There is Component even that Power Station machine main is:

1. RB.211'S type 6562 for Engine's Gas

2. RT's type 62 for Power Turbine

3. Peebles for Electricity Generator


Meanwhile Supporting Component is as follows:

1. Fin fan Cooler( Oli's coolant system Lubricant)

2. Main is Transformer( Parented transformer) to revamp tension 11 kV of generator go to network tension 150 kV.

3. Plant's gas (Generating / gas Processor)

4. compressor's water (Kompressor Airs) for instrument's drive as valve / machine valve

5. Lub oil pump (oli's pump machine) for machine lubricant

Oli's type that is used:

· Lube oil teresso 46 grand Exxo (ISO 9001 by capacities 200 l)

· GG Lube oil is syntetic oil's type (Turbo BP oil 2380 l)

6. Control Building (control's room) utuk is unit operation starts, stop and electric power with system computer (computerized)

7. Unit Trip is that operational condition if happening invasive on syste network or even from system PLTG it own, generating machine unit will die automatically.

8. Unit coolstoops is machine unit stop by operator upon machine care did by presses control's switch pane at spatial control.

9. Unit Starts up is machine operation be back system's afters or dead machine by presses switch at spatial control.

10. Unit crank soak wash is machine wash unit in order to workaday preserve. Washes operational trick this machine follow specified procedure.